CASE STUDY: ENABLING WORKS

CASE STUDY: ENABLING WORKS
Client: Terramond
Value: £820,000.00
Activities: Demolition, construction of new road, services, pumping station, sw drainage system
Enabling Works
As Principal Contractor VertaseFLI has undertaken the construction of enabling works required to permit the redevelopment of a former chemical works, for light industrial use.

VertaseFLI has been responsible for the following activities:

  • Demolition and clearance of the existing industrial buildings
  • Construction of new foul drainage  systems including  package pumping station
  • Construction of new surface water drainage system including new headwalls and outfall
  • Construction of new reinforced concrete access roads
  • Construction of new vehicle crossing points over an  existing surface water course
  • Installation of new service connections to each of the  individual building plots
     
All of the above works were programmed and undertaken in a manner which ensured the uninterrupted access to the adjacent industrial facility and ensured the protection of the ecologically important watercourse which bounded the site.